Taranaki Media Logo
StoriesEventsContact
Light Mode

Watch: First 'Tim Tam' Cycleway Separators Removed from Devon Street West

Watch: First 'Tim Tam' Cycleway Separators Removed from Devon Street West
Taranaki Media

Taranaki Media

3 March 2026

Cycleway TrialRoading New Plymouth District
The first concrete 'Tim Tam' cycleway separators have been removed from New Plymouth's Devon Street West as part of a trial replacing them with rubber alternatives.

The first set of Tim Tam concrete cycleway separators were removed from a portion of Devon Street West this morning to ascertain the costs involved with removal. It marks the first step of a trial that was voted on by NPDC councillors after a motion was narrowly lost to remove all separators and reinstate the road to its original state.

The trial will replace the concrete separators with low-profile rubber replacements and reinstate carparks along a stretch of Devon Street West that is being resealed by NZTA in March. For many local residents and businesses in the area, the loss of parking has been a major pain point, making it difficult for homeowners, visitors, customers and tradespeople to find a spot.

Mayor Max Brough, who campaigned on the removal of the blocks, has dubbed the new rubber replacements “Mallowpuffs.” Unlike the rigid concrete Tim Tams, these 80mm-high rubber dividers are designed to be driven over without damaging vehicles, a common complaint from locals, and will allow traffic to safely pull over to allow emergency vehicles through.

While the Mayor originally hoped for a total removal, the estimated removal costs of $1.6m led councillors to opt for this trial instead. However, the change hasn’t been met with universal praise. At a recent briefing, some residents expressed frustration that the trial doesn’t go far enough, while others questioned the unknown final cost of the “Mallowpuff” installation.

Council staff will be monitoring the new layout closely over the coming months. They are looking at safety data and traffic flow to see if this hybrid design provides the safety cyclists need without the “stress” the concrete blocks caused drivers.

This isn’t a permanent fix just yet. The results of the trial are expected to be reported back to the council in September, at which point elected members will decide if the rest of the Tim Tams stay or go.

Cycleway Separators Tim Tam Removal Tim Tams Devon Street West New Plymouth District Council Max Brough cycleways

More Stories

New Plymouth Surf Club Installs Rainwater System with Council Climate Funding
Community Funding

New Plymouth Surf Club Installs Rainwater System with Council Climate Funding

The East End Surf Life Saving Club has installed a new rainwater storage system funded by NPDC's Community Climate Action Fund to wash down rescue gear and reduce mains water usage.

Taranaki Media1 month ago
State Highway 3 Reopens Under Stop-Go Management Following Mt Messenger Slip
Roading Update

State Highway 3 Reopens Under Stop-Go Management Following Mt Messenger Slip

State Highway 3 has reopened under stop-go traffic management south of the Mt Messenger Tunnel following a large slip.

Taranaki Media2 months ago
Onaero Bay Holiday Park Reopens Under New Management for Whitebait Season
Campground Reopening

Onaero Bay Holiday Park Reopens Under New Management for Whitebait Season

Onaero Bay Holiday Park has reopened under a new five-year lease with Penny, just in time for the start of the 2026 whitebaiting season.

Taranaki Media2 months ago
New Plymouth District Council and Wai Hononga seek feedback on engagement policies
Public Consultation

New Plymouth District Council and Wai Hononga seek feedback on engagement policies

New Plymouth District Council and Wai Hononga Water Services are calling for public feedback on draft policies that determine how the community is consulted on major decisions.

Taranaki Media2 months ago
Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access
Roading Update

Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access

Work has started on rebuilding a section of State Highway 3 through the Awakino Gorge, with the goal of restoring two-lane access by mid-December following severe storm damage.

Taranaki Media2 months ago
Kelvin Wright appointed as new Chief Executive of New Plymouth District Council
Council Appointment

Kelvin Wright appointed as new Chief Executive of New Plymouth District Council

Venture Taranaki Chief Executive Kelvin Wright has been appointed as the new Chief Executive of the New Plymouth District Council, starting his role in October 2026.

Taranaki Media2 months ago
Port Taranaki reports $13.11m profit but warns of future trade drop
Business News

Port Taranaki reports $13.11m profit but warns of future trade drop

Port Taranaki has posted a $13.11 million net profit for the 2025-26 year but warns of a tough future with trade volumes forecast to halve due to shifts in the region's energy sector.

Taranaki Media2 months ago
Summer roadworks planned for State Highway 43 as storm repairs wrap up
Roading Update

Summer roadworks planned for State Highway 43 as storm repairs wrap up

NZTA Waka Kotahi is shifting its focus to long-term resilience on the Forgotten World Highway, with summer construction planned to target vulnerable sections.

Taranaki Media2 months ago
Photos: Devon Street reopens near the Clock Tower
Photos

Photos: Devon Street reopens near the Clock Tower

Devon Street near the Clock Tower has reopened to traffic as the West End Crossing project nears completion.

Taranaki Media2 months ago
View All Stories