Taranaki Media Logo
StoriesEventsContact
Light Mode

Big shake-up coming for young drivers in Taranaki

Big shake-up coming for young drivers in Taranaki
Taranaki Media

Taranaki Media

16 November 2026

TransportTransport New Plymouth
If you've got a teenager learning to drive, there are some changes coming that are worth knowing about. And one of them is likely to raise a few eyebrows: the practical test for getting a full licence is being scrapped.

Big shake-up coming for young drivers in Taranaki

If you've got a teenager learning to drive, there are some changes coming that are worth knowing about. And one of them is likely to raise a few eyebrows: the practical test for getting a full licence is being scrapped.

New driving rules come into force on January 25, 2027, changing the amount of time young people spend on their learner and restricted licences.

The biggest change is that drivers under 25 will generally have to hold their learner licence for 12 months before they can sit their restricted test. At present, it's six months.

There is a way around the longer wait. Young drivers who complete an approved practical driving course or meet the required supervised driving hours can still qualify to sit their restricted test after six months.

For those aged 25 and over, nothing changes at the learner stage. They'll still need to hold their licence for six months.

But there's a trade-off. The restricted period for under-25s is being cut from 18 months to 12 months. Drivers aged 25 and over will need to serve six months.

The really interesting part is what happens next. Under the new system, drivers who complete their restricted period and meet the requirements can move straight to a full licence without sitting another practical driving test.

That doesn't mean the authorities are abandoning safety checks. The hazard perception assessment, which tests a driver's ability to recognise and respond to potential dangers, is being moved into the restricted test.

There is also a small financial bonus. The cost of progressing through the licensing system to a full Class 1 car licence is expected to fall from $362.50 to $282.50. That's an $80 saving.

Another change will make eyesight checks less frequent. Drivers will generally be tested when they first apply for a learner licence and again at 10-year renewals, rather than at every stage of the licensing process.

However, restricted drivers will need to be particularly careful about collecting demerit points. Under the new rules, each offence resulting in demerit points from a police infringement will add another six months to their restricted period. Points accumulated from May 7, 2026, will also count when the new system begins.

For parents in New Plymouth, Stratford and South Taranaki, the message is much the same as it has always been: getting plenty of practice matters.

A teenager who can handle the traffic around central New Plymouth might still find a country road, a busy rural intersection or a wet coastal bend a different proposition.

Road safety advice reported by 1News suggests aiming for around 120 hours of supervised driving before attempting the restricted test. It also recommends keeping practice sessions to manageable lengths rather than spending too long behind the wheel in one go.

There is another change on the horizon. The Government plans to introduce a zero-alcohol limit for all learner and restricted drivers, whatever their age. That will be dealt with separately and won't form part of the January changes.

Anyone already working towards a licence should continue under the existing rules until January 25, when the new system takes effect.

Whether the changes will make young drivers safer is another matter. Giving learners more time to gain experience sounds sensible, but removing the final practical test will undoubtedly prompt some debate.

What do you reckon? Is a longer learner period a good idea, or should every driver have to pass a practical test before getting a full licence?

Transport New Plymouth Stratford Taranaki

More Stories

New Zealand’s darkest year on the roads and Taranaki’s 1991 toll
History

New Zealand’s darkest year on the roads and Taranaki’s 1991 toll

A historical feature looks at New Zealand’s peak road death toll in 1973 and Taranaki’s road safety record over the decades.

Taranaki Media2 weeks ago
Nine overnight SH3 closures planned through Awakino Gorge
Roading

Nine overnight SH3 closures planned through Awakino Gorge

NZTA announced nine overnight closures between the Awakino Historic Tunnel and Manganui Road for recovery work, beginning 27 October 2026.

Taranaki Media3 weeks ago
State Highway 3 Reopens Under Stop-Go Management Following Mt Messenger Slip
Roading Update

State Highway 3 Reopens Under Stop-Go Management Following Mt Messenger Slip

State Highway 3 has reopened under stop-go traffic management south of the Mt Messenger Tunnel following a large slip.

Taranaki Media2 months ago
Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access
Roading Update

Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access

Work has started on rebuilding a section of State Highway 3 through the Awakino Gorge, with the goal of restoring two-lane access by mid-December following severe storm damage.

Taranaki Media2 months ago
Port Taranaki reports $13.11m profit but warns of future trade drop
Business News

Port Taranaki reports $13.11m profit but warns of future trade drop

Port Taranaki has posted a $13.11 million net profit for the 2025-26 year but warns of a tough future with trade volumes forecast to halve due to shifts in the region's energy sector.

Taranaki Media2 months ago
Summer roadworks planned for State Highway 43 as storm repairs wrap up
Roading Update

Summer roadworks planned for State Highway 43 as storm repairs wrap up

NZTA Waka Kotahi is shifting its focus to long-term resilience on the Forgotten World Highway, with summer construction planned to target vulnerable sections.

Taranaki Media2 months ago
Rain postpones planned four-day closure of Awakino Gorge on State Highway 3
Roading Update

Rain postpones planned four-day closure of Awakino Gorge on State Highway 3

NZTA has postponed the upcoming four-day closure of State Highway 3 through the Awakino Gorge due to forecast rain, with the culvert replacement work now rescheduled to start on Saturday 29 August.

Taranaki Media3 months ago
Feedback sought on controversial Devon Street West cycle separators in New Plymouth
Council Survey

Feedback sought on controversial Devon Street West cycle separators in New Plymouth

New Plymouth District Council has launched a survey seeking final public feedback on the trialled Devon Street West cycle separators before a decision in October.

Taranaki Media3 months ago
Drainage Works on State Highway 3 to Cause Delays Between Burgess Hill and Midhirst
Road Works

Drainage Works on State Highway 3 to Cause Delays Between Burgess Hill and Midhirst

NZTA advises motorists to expect delays of 5 to 15 minutes on SH3 between Burgess Hill and Midhirst from 18 August due to essential drainage maintenance.

Taranaki Media3 months ago
View All Stories