Taranaki Media Logo
Taranaki Media
Home
Stories
Events
Videos
Photos
Search (⌘K)
Light Mode
See & Do
    Eat & Drink
      Stay
        Local Directory

          Taranaki Rescue Helicopter Completes First Night Transfer From New Helipad

          Taranaki Rescue Helicopter Completes First Night Transfer From New Helipad
          Tony Skilling

          Tony Skilling

          7 July 2026

          Health NewsHealth Taranaki Base Hospital
          The Taranaki Rescue Helicopter has successfully completed its first night patient transfer from the newly commissioned rooftop helipad at Taranaki Base Hospital.

          Just days after the opening of the new helipad at Taranaki Base Hospital, the Taranaki Rescue Helicopter has made its first night patient transfer.

          The patient was transferred to Waikato Hospital for specialist cardiology care, with the first night takeoff from the helipad going smoothly.

          The commissioning of the rooftop helipad marks one of the final stages of departmental moves into Taranaki Base Hospital's new East Wing building, Te Rau Mātāpuna o Taranaki.

          Situated six storeys above ground level, the new facility ranks among the most advanced healthcare helipads in New Zealand.

          Health New Zealand Taranaki confirmed the 25-metre by 25-metre deck is engineered to support aircraft weighing up to 7,000 kilograms.

          This substantial capacity allows it to safely accommodate heavy helicopters, such as the PHI aircraft frequently utilised by the region's offshore oil and gas sectors.

          Positioned directly above the Emergency Department, the helipad connects to critical care areas via dedicated express lifts.

          This layout ensures rapid patient transfers and direct access to specialist medical care for people across the wider Taranaki region.

          The setup also features a specialised helipad lounge designed specifically for patients awaiting or arriving from transit.

          The infrastructure includes high-tech safety systems to manage potential risks on the roof.

          A passive fire-suppression system is built into the deck to instantly contain and extinguish fuel fires if a helicopter tank ruptures.

          For night operations, incoming pilots can use remote technology to activate the helipad’s lighting system from up to 15 kilometres away.

          The completion of the helipad secures a 24-hour operational service capability for Taranaki emergency healthcare for decades to come.

          Taranaki Base Hospital Taranaki Rescue Helicopter Helipad Te Rau Mātāpuna o Taranaki Patient Transfer
          f

          View on Facebook

          See the original post and join the conversation on Facebook.

          Views
          34.2K
          Post clicks
          771
          Reactions
          284
          Comments
          12
          Shares
          12
          View post on Facebook

          Stats updated 27 Aug 2026, 4:41 am

          More Stories

          Waitara High School to Receive Two New Classrooms in Government Funding Round
          School Funding

          Waitara High School to Receive Two New Classrooms in Government Funding Round

          Waitara High School is set to receive two new classrooms as part of a $32.8 million Government property investment aimed at easing roll growth pressures across New Zealand.

          Tony Skilling1 week ago
          Taranaki Alliance Secures $3 Million Government Grant to Support Engineering Sector Pivot
          Regional Grant

          Taranaki Alliance Secures $3 Million Government Grant to Support Engineering Sector Pivot

          A $3 million Regional Infrastructure Fund grant has been awarded to the Taranaki Alliance to help local engineering and manufacturing firms transition away from the oil and gas sector.

          Tony Skilling1 week ago
          Photos: Queen Street Cenotaph pedestrian space complete
          Photos

          Photos: Queen Street Cenotaph pedestrian space complete

          The new pedestrian space around the Queen Street Cenotaph is complete, with seating, planting and safety improvements in place.

          Tony Skilling2 weeks ago
          New Plymouth District Council and Wai Hononga seek feedback on engagement policies
          Public Consultation

          New Plymouth District Council and Wai Hononga seek feedback on engagement policies

          New Plymouth District Council and Wai Hononga Water Services are calling for public feedback on draft policies that determine how the community is consulted on major decisions.

          Tony Skilling2 weeks ago
          Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access
          Roading Update

          Work Begins on SH3 Awakino Gorge Rebuild to Restore Two-Lane Access

          Work has started on rebuilding a section of State Highway 3 through the Awakino Gorge, with the goal of restoring two-lane access by mid-December following severe storm damage.

          Tony Skilling2 weeks ago
          New Specialist Pharmacist Role Appointed at Taranaki Cancer Centre
          Health

          New Specialist Pharmacist Role Appointed at Taranaki Cancer Centre

          Senior oncology clinical pharmacist Diana Harkin has stepped into a new permanent role at the Taranaki Cancer Centre to streamline complex medication plans and support frontline staff.

          Tony Skilling2 weeks ago
          Taranaki flight nurse Rachel Shearer celebrates 1000th patient transfer milestone
          Health Milestone

          Taranaki flight nurse Rachel Shearer celebrates 1000th patient transfer milestone

          Taranaki Base Hospital nurse Rachel Shearer has overcome her fear of flying to complete her 1000th patient transfer flight, delivering critical care across the North Island.

          Tony Skilling2 weeks ago
          Methanex to indefinitely idle Taranaki production facilities in early 2027
          Economic Blow

          Methanex to indefinitely idle Taranaki production facilities in early 2027

          Methanex Corporation has announced it will indefinitely idle its New Zealand production facilities in early 2027, dealing a major blow to the Taranaki economy due to declining natural gas availability.

          Tony Skilling2 weeks ago
          Summer roadworks planned for State Highway 43 as storm repairs wrap up
          Roading Update

          Summer roadworks planned for State Highway 43 as storm repairs wrap up

          NZTA Waka Kotahi is shifting its focus to long-term resilience on the Forgotten World Highway, with summer construction planned to target vulnerable sections.

          Tony Skilling2 weeks ago
          View All Stories