Taranaki Media Logo
StoriesEventsContact
Light Mode

Fonterra Whareroa and Taranaki’s largest industrial buildings

Fonterra Whareroa and Taranaki’s largest industrial buildings
Taranaki Media

Taranaki Media

6 November 2026

BusinessBusiness Hāwera
However, there is an important distinction between the largest single building and the largest industrial site.

The strongest candidate for Taranaki's largest building or industrial building complex is the Fonterra Whareroa dairy factory, just south of Hāwera.

However, there is an important distinction between the largest single building and the largest industrial site.

Fonterra Whareroa Factory
Located approximately 3 kilometres south of Hāwera.

Described by Engineering New Zealand as the world's largest dairy-processing complex on one site.

Employs approximately 1,000 people.

Processes up to 12.5 million litres of milk per day.

Has 11 manufacturing plants.

Produces milk powder, butter, cheese and other dairy products.

Its enormous new buildings

24,000 square metres: A major milk-powder dry-store expansion at Whareroa.

19,000 square metres: A new cheese cool store announced in September 2024, costing approximately $150 million. It is roughly the size of three rugby fields and will store around 26,000 tonnes of cheese.

Business Hāwera Taranaki

More Stories

How NP retailers can welcome dogs and their owners with small cost-effective changes
Business

How NP retailers can welcome dogs and their owners with small cost-effective changes

Not everyone agrees with dogs in the CBD. However, it's also a new opportunity for New Plymouth retailers. And you don't need to spend hundreds of dollars to become more dog-friendly. In many cases, a water bowl, a…

Taranaki Media2 days ago
Taranaki business awards celebrate three decades of achievement
Business

Taranaki business awards celebrate three decades of achievement

From family-owned enterprises and ambitious start-ups to major engineering companies, the TSB Taranaki Chamber of Commerce Business Excellence Awards have been recognising the people behind the region's business…

Taranaki Media4 days ago
New Plymouth-built ammonia storage tanks bound for Australia
Business

New Plymouth-built ammonia storage tanks bound for Australia

Local firm Dialog Fitzroy constructed the three 100-tonne pressure vessels for Hiringa Energy at a cost of around $3 million. Each tank measures 35 metres long and 3.5 metres in diameter.

Taranaki Media5 days ago
Taranaki's Oil and Gas Industry: The Big Picture
Business

Taranaki's Oil and Gas Industry: The Big Picture

Gas production is falling, some major fields are nearing the end of their productive lives, and Methanex is preparing to shut down its remaining methanol production. The expected closure of the Māui field adds to the…

Taranaki Media1 week ago
Could Taranaki Have Its Own Oil Refinery Again?
Business

Could Taranaki Have Its Own Oil Refinery Again?

Taranaki has been at the heart of New Zealand’s oil industry for more than 160 years. Now, with renewed interest in exploration and the potential of Monumental Energy’s Maata prospect, an intriguing question arises:…

Taranaki Media1 week ago
Taranaki oil revival: Max Sali has big ambitions beneath our feet
Business

Taranaki oil revival: Max Sali has big ambitions beneath our feet

Canadian energy entrepreneur Max Sali is bringing renewed enthusiasm and investment to Taranaki's oil industry, with a potentially 10-million-barrel discovery at Maata among several projects he believes could unlock…

Taranaki Media1 week ago
Taranaki Alliance Secures $3 Million Government Grant to Support Engineering Sector Pivot
Regional Grant

Taranaki Alliance Secures $3 Million Government Grant to Support Engineering Sector Pivot

A $3 million Regional Infrastructure Fund grant has been awarded to the Taranaki Alliance to help local engineering and manufacturing firms transition away from the oil and gas sector.

Taranaki Media2 months ago
Todd Energy Secures $23.5 Million Government Loan to Boost Taranaki Gas Production
Energy News

Todd Energy Secures $23.5 Million Government Loan to Boost Taranaki Gas Production

Todd Energy will receive a $23.5 million loan from the Government's Gas Security Fund to support two natural gas projects in North Taranaki.

Taranaki Media2 months ago
Shane Jones Points to Defence Contracts as Lifeline for Taranaki Engineering
Business News

Shane Jones Points to Defence Contracts as Lifeline for Taranaki Engineering

Resources Minister Shane Jones says lucrative military contracts could provide a vital lifeline for Taranaki's heavy engineering sector following the announced closure of the Methanex Motunui plant.

Taranaki Media2 months ago
View All Stories